REVISED RESPONSE TO REQUEST FOR ADDITIONAL2017-11-2015.00.03-2_Rev.4 - 5 / 5 KEPCO/KHNP the guidance specified in RG 1.183, Appendix F, Section 5.1, this leakage is conservatively used in the dose analyses to maximize the offsite doses. Impact on DCD DCD Table 6.4-2, 15.0-10, 15.1.5-13, 15.6.3-6 and 15.7.4-2 will be revised as indicated in Attachment. Impact
[email protected]The leak rate through a crack can be estimated by multiplying G c with the crack opening area at the crack exit plane, A c. The pressure at the interface plane, p m, is also an unknown vari-
Get Price2017-11-2015.00.03-2_Rev.4 - 5 / 5 KEPCO/KHNP the guidance specified in RG 1.183, Appendix F, Section 5.1, this leakage is conservatively used in the dose analyses to maximize the offsite doses. Impact on DCD DCD Table 6.4-2 , 15.0-10, 15.1.5-13, 15.6.3-6 and 15.7.4-2 will be revised as indicated in Attachment. Impact
Get Price2018-12-5The leak test is composed of a vacuum decay test, a pressure drop test, and a tracer gas test. To measure the leakage rate of a stator winding, Eqs. (1) and (2) are used for the vacuum decay and pressure drop tests, respectively, in the generator stator windings. In the vacuum decay and pressure drop tests, the leakage rate
Get Price2015-12-9The following question applies to Subsection 3.6.3.5.5.2 Constructing a Leak-Before-Break Piping Evaluation Diagram: 1. In the calculation of effective bending moment, it is not clear if the crack face pressure was included. Please identify if the crack face pressure was included in the calculation. 2.
Get Price2016-12-20can be used to estimate the leak rate of steamewater mixture throughcracksinpipesorvessels.Usingtheprogram,theleak rate was calculated for through-thickness cracks with a con-stant or linearly varying cross-sectional area in a bimaterial pipe. In addition, the results were compared with the results for a
Get PriceTranslate this page2019-4-3韩国电力公司(Korea Electric Power Corporation),简称KEPCO,也被称为韩国电力公社。2012年 财富世界500强企业中排名第264位。 韩国电力公司是一家国营电力公司,韩国目前唯一的电力公司,成立于1898年1月26日,该公司致力于各种开发电力资源的项目
Get Pricea controlled rate. Model 30A cylinder in which the nominal net weight of UF6 is 2,180 kg is selected for the object of acci-dent. Let us consider the following postulated rupture accident. It is assumed that the rupture of UF6 gas line connected to hot UF6 cylinder occurs in the vaporization room.
Get Price2020-8-4Background: The UAE–South Korea nuclear partnership began in 2009, when Korea Electric Power Corporation (Kepco) was awarded the prime contract to design, build, and help operate the Barakah plant, located in the Al Dhafra region of Abu Dhabi. In 2016, ENEC and Kepco signed a joint venture agreement for a long-term partnership to become joint owners of Nawah Energy and Barakah One Company, with ENEC owning 82 percent of the two companies and Kepco
Office Add: Kexue Revenue, High and New Technology Industrial Development Zone, Zhengzhou, China